Bathroom Remodel

After a couple of months here and with a desire to spend more time here, we decided to make some improvements to the bathroom. It’s hard to explain what it was like before – it had a concrete floor and ceiling, and very rough brick walls. There was a toilet and a shower and not much else (no sink). Here is the only “before” photo photo I have – you can see a little bit of the rough brick, but the contractor has already started plastering over it.

“Before”, with some of the old brick showing

Below is how it looks now, about 95% complete (the electrical part is not yet done). We tiled all four walls plus the floor, plastered the ceiling, added a shelf, upgraded the shower, added a sink and a new toilet, and installed various accessories. My contribution was that I built the mirror frame from scratch! Total cost for all materials, supplies and labor was about $1,300 US. Next we need to finish the exterior.

Shower
Toilet
Sink
Mirror